Planning
We review scope, existing conditions, equipment, code requirements, access, and future needs before work begins.
Overview
Lighting work ranges from a single fixture to a complete building lighting system. We plan fixture locations, switching, dimming, controls, circuits, mounting conditions, color temperature, and power requirements around the space and its use.
Fixture spacing, ceiling conditions, switching, dimming compatibility, access above the ceiling, insulation, and existing circuit capacity all affect the final lighting plan.
Why Ampere
We review scope, existing conditions, equipment, code requirements, access, and future needs before work begins.
Work is completed with attention to clean routing, reliable connections, code compliance, and coordination with surrounding finishes.
We test and review completed systems and make sure the finished work is ready for normal use and future service.
Process
Confirm project goals, site conditions, existing equipment, and constraints.
Define scope, materials, routing, scheduling, and permit requirements where applicable.
Complete the work safely and coordinate with finishes, equipment, and other trades.
Verify operation, review the completed work, and address final details.
Common Questions
Spacing depends on ceiling height, room dimensions, fixture output, beam spread, task areas, furniture layout, and the desired overall light level.
Yes. We can coordinate compatible dimmers, switches, smart controls, and fixture drivers as part of the lighting installation.
Sometimes. Access, framing direction, insulation, existing wiring routes, and fixture locations determine how much opening and patching may be required.